• Home
  • E-Paper
  • Archive
  • Contact us
  • Daily Pakistan
Monday, June 23, 2025
  • Login
Daily The Patriot
  • Home
  • Top Stories
  • National
  • World
  • Business
  • Sports
  • Showbiz
  • Technology
  • Editorial
  • Opinion
  • E-Paper
    • Archive E-Paper
No Result
View All Result
  • Home
  • Top Stories
  • National
  • World
  • Business
  • Sports
  • Showbiz
  • Technology
  • Editorial
  • Opinion
  • E-Paper
    • Archive E-Paper
No Result
View All Result
Daily The Patriot
No Result
View All Result
Home City

No power load-shedding in country from today: ministry

by Daily Patriot
May 2, 2022
in City, National
0
0
SHARES
67
VIEWS
Share on FacebookShare on Twitter
The Ministry of Energy announces to end load-shedding from today. Photo: AFP/file

ISLAMABAD: As per the promise made by Prime Minister Shehbaz Sharif, the power load-shedding in the country has been reduced to zero from 5 am today, claimed the Minister of Energy.

The spokesperson for the minister noted: “The ministry is constantly striving for uninterrupted power supply during the Eid holidays and beyond.” PM Shahbaz directs to end load-shedding  On April 26, Prime Minister Shehbaz Sharif had directed to end load-shedding in the country from May 1. PM Shehbaz Sharif had issued the directives while chairing a high-level emergency meeting to overcome the prevailing electricity crisis in the country. He had said the people cannot be put into trouble due to load-shedding in the summer season and directed the authorities concerned to take immediate measures to address the issue. 

The prime minister also sought a long-term effective plan to end the losses of loss-making power distribution companies.  During the meeting, the prime minister was given a comprehensive briefing on the generation of electricity and its transmission and consumption in the country. Out of 27 power plants that were shut down for over one year, 20 had been made functional, the prime minister was told. The meeting was informed that the previous government did not ensure timely provision of fuel to operate the power plants. It was shared that the power plants were not repaired timely which triggered a crisis in the power sector. The prime minister was told that the total power generation has reached 18,500 megawatts. In terms of demand, there is a shortfall of 500 to 2,000 megawatts.

Taking to Twitter, the Ministry of Energy that it worked hard to add more than 2500 Megawatt of additional power to the national grid system.

https://twitter.com/MoWP15/status/1520732114395795456?ref_src=twsrc%5Etfw%7Ctwcamp%5Etweetembed%7Ctwterm%5E1520732114395795456%7Ctwgr%5E%7Ctwcon%5Es1_c10&ref_url=https%3A%2F%2Fwww.geo.tv%2Flatest%2F414808-no-power-load-shedding-in-country-from-today-ministry

Tags: Eid holidayselectricity crisisislamabadPML-NShehbaz Sharif
Daily Patriot

Daily Patriot

Next Post

Press autonomy day

Latest News

Rain brings relief in Lahore, breaks humidity spell
National

Rain brings relief in Lahore, breaks humidity spell

by Web Desk
June 22, 2025
0

Rainfall in Lahore on Sunday brought much-needed relief from the humidity, as temperatures dropped and the weather turned pleasant across...

Read more
Trump's Nobel Peace Prize nomination is 'ultimate symbol of slavery', says Barrister Saif

Trump’s Nobel Peace Prize nomination is ‘ultimate symbol of slavery’, says Barrister Saif

June 22, 2025
Recommending Nobel Prize for Trump is a diplomatic blunder: Liaqat Baloch

Recommending Nobel Prize for Trump is a diplomatic blunder: Liaqat Baloch

June 22, 2025
PM Shehbaz Convenes Key National Security Committee Meeting Amid Iran-US Tensions

PM Shehbaz Convenes Key National Security Committee Meeting Amid Iran-US Tensions

June 22, 2025
PM Shehbaz Briefs Nawaz Sharif on Iran Crisis, Reaffirms Diplomatic Support for Tehran

PM Shehbaz Briefs Nawaz Sharif on Iran Crisis, Reaffirms Diplomatic Support for Tehran

June 22, 2025
  • Home
  • Top Stories
  • National
  • World
  • Business
  • Sports
  • Showbiz
  • Technology
  • Editorial
  • Opinion
  • E-Paper
Call us: 051-233-1674

© 2025 DAILY PATRIOT - For the latest news updates from the Daily Patriot. Download Our Apps image description image description

No Result
View All Result
  • Home
  • Top Stories
  • National
  • World
  • Business
  • Sports
  • Showbiz
  • Technology
  • Editorial
  • Opinion
  • E-Paper
    • Archive E-Paper

© 2025 DAILY PATRIOT - For the latest news updates from the Daily Patriot. Download Our Apps image description image description

Welcome Back!

Login to your account below

Forgotten Password?

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In